(POR) - PERMISSIVE OVER-REACHING SCHEME:
# ~( R( H, i* }( A- B9 U- wCOVERAGE AREA: Zone 2 fault detectors at each line terminal are set to reach about 125% of the line length (or impedance) from the local terminal. Zone 2 therefore covers the full line section and “over-reaches” beyond the remote terminal(s).
9 g! o7 ?+ B+ n 7 v* E3 F9 s! o `6 }3 }" D
FAULT CLEARANCE / TRIPPING: High-speed tripping at the local terminal occurs from Zone 2 directly. Communication (i.e. Permissive) signals are transmitted to the remote terminals to allow instantaneous Zone 2 tripping to occur at all remote terminals. When a permissive signal is NOT received, tripping at remote terminal(s) becomes timed and occurs after 400ms. . j1 V& w- I+ V5 ~" R5 k$ }$ r5 _
3 m9 I: H8 O- C `+ b. p- @
EVENTS / SEQUENCE:
' Q$ G- M( A* |0 w . A; ?* E9 ?; D8 H
1.
. [5 Y; W# o2 b: E' _ w! j: IWhen the Zone 2 fault detector picks up, the local breaker(s) are tripped immediately.
. Z2 J( Z* ] L" E2.& I5 t S. ~' s
Communication (Permissive) signals are sent via the identified COMMUNICATION MEDIUM to the remote terminal(s) as identified in the COMMUNICATION MECHANISM to energize the tripping receive relays.
+ o2 V- ~6 K6 E- B3.
/ m8 Y* E4 k: d3 V) I# T3 P, ?$ iWhen the permissive signal is received (or after 400ms), the remote terminal(s) are tripped from the Zone 2 timed tripping relays.8 h& s9 C1 p0 m
7 Q6 J: c; P4 s& g& c& R
LINE / SCHEME DIAGRAM- c* T( a( M9 c q: u
L: G* @ i0 U7 U/ U
& X$ |$ \1 @) a% y0 W
3 n$ v8 M% y7 U$ ~5 O+ S
BACKGROUND:% T5 `3 L) z0 U4 f* z7 K
High voltage protection on Hydro One lines are presented in a form of protection groups made up of individual schemes, this above scheme is one that is part of the protection group listed for this element.
5 l( O0 w; Z! K4 p: p$ ^* r5 a! e
7 P V7 M# b. Z. X) w) y) [The advantage of PERMISSIVE OVER-REACHING is high-speed tripping for cases that cannot be covered by the Zone 1 fault detectors (i.e. DUR scheme). 9 G" W7 N4 [1 Y, t, e/ \
( d: q( D$ ^ [( K3 e3 n
POR also provides an alternate instantaneous protection to the DUR scheme, with separate fault detectors and a separate communication path. ( @: A; d: D+ w5 ]" x% X% z7 r& {
9 ~0 v3 Z+ J) i |$ D, j! @8 D
For the POR scheme to operate correctly, consideration has to be given to the reduction of relay reach (i.e. coverage) due to infeeds from tapped supply station(s).
2 ^6 ] f+ p n1 ] w$ O$ e# c; v/ @% \) G4 z L
Faults Within the Circuit Zone (Diagram A):
9 }4 Q% z/ }; G& L1 ~9 [/ _& _Faults on any part of the line are located within the Zone 2 fault detectors as they are set to see approximately 125% of the circuit length or impedance. When a fault occurs on the circuit, the Zone 2 fault detectors at each terminal(s) are picked up and they send a “permissive” communication signal to each other. Upon receiving the permissive signal from the remote terminal(s), the local trip relays become energized, tripping the local terminal and clearing the fault. ) N. v3 y- U7 L0 @
" |4 P, w( b! @$ v: ?3 {
In summary, POR instantaneous tripping can only occur at a terminal when:: n9 M6 Y8 r" Z3 h, i2 [
- U8 m% N% d+ F" S8 H8 _4 R7 b3 E
a)5 ?$ W1 c) V* C! ^" ^' M4 j) q% ]5 Z6 A
the Zone 2 fault detector at that terminal is picked up
# y, c2 V; o% v Lb)+ x; i; Z3 T$ U9 S3 Y
a permissive signal is received from the remote terminal(s)
, I* C1 U* d" H' F8 T
! `& I2 b) k% J9 J+ wFaults Outside the Circuit Zone (Diagram B):( H+ U9 X7 ] {
0 W3 k8 g* l# W$ o6 w
When the fault occurs beyond a local terminal (i.e. on a neighbouring circuit, outside/beyond the protected circuit), it is seen by the Zone 2 relays of one of the protected circuit remote terminals and a permissive signal is sent to the local terminal where the fault is beyond. The local terminal’s Zone 2 relays will not be energized (as this terminal does not see the fault outside/beyond the circuit) and NO instantaneous tripping will occur at the local or remote terminal(s). The remote terminal(s) will clear on timed relays after 400ms and send a trip signal to all other terminals to initiate tripping at those terminals.
: u9 t+ w. ], E8 D6 h; z
, I* s+ D5 o9 Q% o. p* [( U“Echo” Feature (Diagram C):* I% ? D6 n: K- x2 p- J
. F2 j) L: m7 K( c# T$ {9 _1 @9 U
When the line disconnect at one terminal is open, its fault detectors will not be able to detect any faults on the circuit and a section of the circuit (i.e. beyond the remote terminal Zone 1 coverage area) would not be covered by instantaneous tripping (i.e. up to the open line disconnect).
6 x; B0 w9 M, c, cTo ensure that instantaneous tripping remains in place for the length of line beyond the remote terminal Zone 1 coverage area and the open line disconnect, a feature referred to as “echoing” (also called “line end open” logic) makes up part of the POR scheme.
5 p, F& w- X% L. L1 Z
; e& b" j/ p0 ]* x8 t , s* H' V N4 b' s1 L
The sequence of events is such that when a remote terminal Zone 2 relay picks up, it sends a permissive signal to the local terminal. Upon receiving this signal, the local terminal “echoes back" a return permissive signal to the remote terminal to allow instantaneous tripping to occur at the remote terminal(s).' K' i2 {$ a6 v! \
' T& J7 i: ^" j& mStandard high voltage protection provides high speed tripping at the local and remote line terminals from Zone 1 directly and from Zone 2 via permissive over-reaching or directional comparison, using communication media. Timed and Line Test tripping involve the local terminal only. Reclosing is only provided from the high-speed protection.
t. t& t v5 `- X9 e9 A6 m % L3 x5 _7 V q
|
|