Geodynamics Proves Viability of Enhanced Geothermal Systems 1 ~- E. N( x6 `0 G2 l8 g3 q1 N
Geodynamics Limited has claimed success in creating a geothermal reservoir at a geological "hot spot," proving the feasibility of so-called Enhanced Geothermal Systems (EGS). The company's Habanero project in South Australia's Cooper Basin involved injecting high pressure water into a geologic formation where high temperatures were known to exist, thereby fracturing the rock and forming an underground geothermal reservoir. To tap that reservoir required drilling a second nearby well, allowing water to be injected into one of the wells, where it would pass through fractures in the hot rock and be steadily heated until it was extracted again through the second well. In late March, Geodynamics completed a successful flow test using two of its Habanero wells, leading the company to announce that it has successfully achieved its proof of concept. See the EGS page on the DOE Geothermal Technologies Program Web site for an illustration and detailed description of the EGS concept. . N. m6 o0 \+ }

2 ~/ h, _3 B+ O" f+ t: q' nGeodynamic's closed-loop testing between two of its wells—Habanero 1 and 3—reached a maximum flow of 15.5 kilograms per second (kg/s), and modeling of the reservoir indicated that at flows of 70 kg/s, it would be capable of generating more than 40 thermal megawatts for 20 years with only a slight drop in temperature. The flow loop test is the result of six years of work, and the next step is to install a pilot power plant that will generate 1 megawatt of power. Geodynamics intends to install that pilot plant by mid-year, providing power to the nearby town of Innamincka. The company plans to follow that with Australia's first commercial-scale geothermal power plant, which should be operating by 2012. See Geodynamic's announcement of its completion of the flow test (PDF 277 KB), which includes an independent contractor report, and the company's accompanying press release (PDF 59 KB). Download Adobe Reader.
"真诚赞赏,手留余香"
还没有人打赏,支持一下
楼主热帖
帖文化:【文明发帖 和谐互动】 社区精神:【创新、交流、互助、共享】
  • TA的每日心情
    奋斗
    2019-9-25 20:46
  • 签到天数: 7 天

    连续签到: 1 天

    [LV.3]偶尔看看II

    累计签到:7 天
    连续签到:1 天
    发表于 2009-4-9 10:38:10 | 显示全部楼层
    有点意思,值得关注
    "真诚赞赏,手留余香"
    还没有人打赏,支持一下
    帖文化:【文明发帖 和谐互动】 社区精神:【创新、交流、互助、共享】
  • TA的每日心情
    郁闷
    2017-6-11 22:50
  • 签到天数: 4 天

    连续签到: 2 天

    [LV.2]偶尔看看I

    累计签到:5 天
    连续签到:1 天
    发表于 2009-4-9 12:05:51 | 显示全部楼层
    关注一下,
    "真诚赞赏,手留余香"
    还没有人打赏,支持一下
    帖文化:【文明发帖 和谐互动】 社区精神:【创新、交流、互助、共享】
    您需要登录后才可以回帖 登录 | 立即加入

    本版积分规则

    招聘斑竹

    小黑屋|手机版|APP下载(beta)|Archiver|电力研学网 ( 赣ICP备12000811号-1|赣公网安备36040302000210号 )|网站地图

    GMT+8, 2024-5-22 14:12

    Powered by Discuz! X3.5 Licensed

    © 2001-2024 Discuz! Team.

    快速回复 返回顶部 返回列表