论文文献
标题: OPERATION OF ±100MVAR TVA STATCON
作者: C.Schauder, M.Gerhardt, E.Stacey,T.Lemark, L.Gyugyi and etc.
所属专业方向: STATCOM电力电子与电力传动
摘要: In 1995 a ±100MVA Static Synchronous Compensator (STATCON)* was commissioned for the Tennessee Valley Authority (TVA) at the Sullivan Substation in North-Eastern Tennessee. This was an historic milestone in the initiative for Flexible AC Transmission System (FACTS) promoted by the Electric Power Research Institute (EPRI). The TVA STATCON is the first of its kind, using GTO thyristor valves, to be commissioned in the United States, and is currently the largest installation of this type in the world. Commissioning tests have now been completed and the STATCON is operating continuously on line. The demonstrated performance of the equipment has either met or exceeded expectations in all areas and has proven beyond doubt the viability of the equipment in high power transmission systems. This paper briefly reviews the STATCON installation and reports on the static and dynamic performance observed during commissioning.
关键字: statcon
来源: IEEE Transactions on Power Delivery,1997,12(4)

马上加入,结交更多好友,共享更多资料,让你轻松玩转电力研学社区!

您需要 登录 才可以下载或查看,没有账号?立即加入

×
这是第二篇。三篇文章是有联系的,可以看到世界上第一台STATCON的问世说明。

100MVARop.rar

1013.42 KB, 下载次数: 5, 下载积分: 威望 -2 点, 学分 -5 点

"真诚赞赏,手留余香"
还没有人打赏,支持一下
楼主热帖
帖文化:【文明发帖 和谐互动】 社区精神:【创新、交流、互助、共享】
您需要登录后才可以回帖 登录 | 立即加入

本版积分规则

招聘斑竹

小黑屋|手机版|APP下载(beta)|Archiver|电力研学网 ( 赣ICP备12000811号-1|赣公网安备36040302000210号 )|网站地图

GMT+8, 2024-4-20 08:49

Powered by Discuz! X3.5 Licensed

© 2001-2024 Discuz! Team.

快速回复 返回顶部 返回列表