在一份资料中看到model搭建完成后可以不连接其他设备,进行开环测试,操作如下: ) [4 D: q+ J8 @3 n% d9 e; L l' e4 \1 H; [5 m. z, F+ _ Verify the behaviour of the model by an open-loop test, i.e. the controller is not connected to any & b( e' b* F# D) l1 E3 \1 P7 Eother element (synchronous generator) in the grid:3 L, {# w3 |9 e/ p- y( X- N
; _' b- K% w9 g# P4 GOpen-Loop Response:% _; N0 V) _3 u0 ]! `3 p; L- \% L: f  1 Test the model with a step response to the reference voltage “usetp” (open-loop-test) [17]. / m0 U0 o2 N/ h7 c 2 Define a variable set to monitor for the VCO element and visualize the results of the simulated step response 4 o* _. T9 Z! e: W. ~! J& l& A8 Q7 |$ B
上面第一步的具体操作过程:) a& I, [ v- V& d. r2 _
#17: Open-Loop Test1 E2 w. c8 [: E( d
# v" p: R' r: |! ^8 C 1 Open the event list ( ) and use the “New Object” button to insert a “Set Parameter(EvtPara)” event" T( s: \1 ^( W# _
 2 Select the AVR controller for the element.# R- s9 ~4 i0 ?5 W- \
 3 Insert the name of the variable ‘usetp’ and the new value for this variable (=0.9)." s! J; f* I- j1 W$ |3 d- q8 O