sw249161 发表于 2013-1-23 18:25:22

求助,使用digsilent构建10机39节点后潮流运算超载如何解决

使用digsilent构建10机39节点后 潮流运算超载如何解决:1,诸位大神有无类似情况 是否是参数问题 如果与BPA数据对照 格式完全不同 如何让系统正常
原始数据来自039IEEE 039TH

-----------------------------------------------------------------------------------------------------------------------------------
| Load Flow Calculation                                                                                                         |
-----------------------------------------------------------------------------------------------------------------------------------
|   AC Load Flow, balanced, positive sequence            |                                                                  |
|   Automatic Tap Adjust of Transformers            No   |                                                                  |
|   Consider Reactive Power Limits                  No   |    Max. Loading of Edge Element                         80.00 %    |
|   Automatic Model Adaptation for Convergency      No   |    Lower Limit of Allowed Voltage                        0.95 p.u. |
|                                                            |    Upper Limit of Allowed Voltage                        1.05 p.u. |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
|               |                                                                |   DIgSILENT   | Project:                     |
|               |                                                                | PowerFactory|-------------------------------
|               |                                                                |    14.0.514   | Date:1/23/2013             |
-----------------------------------------------------------------------------------------------------------------------------------
| Study Case: Study Case                                                                           | Annex:                  / 1|
-----------------------------------------------------------------------------------------------------------------------------------
|                              Loading         Voltage                              Apparent Power         Current            |
|Name                   Type       [%]             Station/Branch                                      |
-----------------------------------------------------------------------------------------------------------------------------------
|Overloaded Elements                                                                                                            |
| B                     Term               1.07    106.91    BUS-19                                                             |
| B                     Term               1.07    106.97    BUS-22                                                             |
| B                     Term               1.06    106.30    BUS-23                                                             |
| B                     Term               1.05    105.23    BUS-24                                                             |
| B                     Term               1.05    105.27    BUS-29                                                             |
| BQ                  Term               1.06    106.35    BUS-36                                                             |
| L-11-10               Lne      203.24                        BUS-11/B                366.42          2.03         2.03      |
|                                                            BUS-10/B                365.91          2.02         2.02      |
| L-11-6                Lne      196.07                        BUS-6/B               352.31          1.96         1.96      |
|                                                            BUS-11/B                353.49          1.96         1.96      |
| L-13-10               Lne      170.01                        BUS-13/B                308.07          1.70         1.70      |
|                                                            BUS-10/B                308.49          1.70         1.70      |
| L-14-13               Lne      165.89                        BUS-14/B                297.97          1.66         1.66      |
|                                                            BUS-13/B                296.09          1.63         1.63      |
| L-14-4                Lne      156.85                        BUS-4/B               278.28          1.57         1.57      |
|                                                            BUS-14/B                277.21          1.54         1.54      |
| L-16-15               Lne      178.64                        BUS-16/B                317.10          1.75         1.75      |
|                                                            BUS-15/B                319.74          1.79         1.79      |
| L-17-16               Lne      120.47                        BUS-17/B                216.77          1.20         1.20      |
|                                                            BUS-16/B                213.55          1.18         1.18      |
| L-18-17               Lne      120.32                        BUS-18/B                215.15          1.20         1.20      |
|                                                            BUS-17/B                212.26          1.18         1.18      |
| L-19-16               Lne      256.40                        BUS-16/B                464.61          2.56         2.56      |
|                                                            BUS-19/B                468.41          2.53         2.53      |
| L-2-1               Lne       82.37                        BUS-2/B               145.40          0.82         0.82      |
|                                                            BUS-1/B               118.44          0.66         0.66      |
| L-21-16               Lne      182.61                        BUS-16/B                330.90          1.83         1.83      |
|                                                            BUS-21/B                331.55          1.82         1.82      |
| L-22-21               Lne      338.80                        BUS-21/B                615.65          3.39         3.39      |
|                                                            BUS-22/B                622.05          3.36         3.36      |
| L-24-23               Lne      193.08                        BUS-24/B                351.91          1.93         1.93      |
|                                                            BUS-23/B                354.33          1.92         1.92      |
| L-25-2                Lne      199.61                        BUS-25/B                350.07          2.00         2.00      |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Study Case: Study Case                                                                           | Annex:                  / 2|
-----------------------------------------------------------------------------------------------------------------------------------
|                              Loading         Voltage                              Apparent Power         Current            |
|Name                   Type       [%]             Station/Branch                                      |
-----------------------------------------------------------------------------------------------------------------------------------
|                                                            BUS-2/B               340.90          1.93         1.93      |
| L-26-25               Lne       83.19                        BUS-25/B                145.90          0.83         0.83      |
|                                                            BUS-26/B                109.80          0.61         0.61      |
| L-27-26               Lne      158.03                        BUS-26/B                282.95          1.57         1.57      |
|                                                            BUS-27/B                282.80          1.58         1.58      |
| L-28-26               Lne       83.79                        BUS-26/B                150.85          0.84         0.84      |
|                                                            BUS-28/B                147.60          0.81         0.81      |
| L-29-26               Lne      110.39                        BUS-26/B                198.73          1.10         1.10      |
|                                                            BUS-29/B                198.86          1.09         1.09      |
| L-29-28               Lne      193.22                        BUS-28/B                350.51          1.93         1.93      |
|                                                            BUS-29/B                352.31          1.93         1.93      |
| L-3-2               Lne      205.38                        BUS-2/B               362.52          2.05         2.05      |
|                                                            BUS-3/B               359.30          2.02         2.02      |
| L-5-4               Lne      101.87                        BUS-4/B               180.74          1.02         1.02      |
|                                                            BUS-5/B               176.34          0.98         0.98      |
| L-6-5               Lne      280.78                        BUS-5/B               503.57          2.81         2.81      |
|                                                            BUS-6/B               504.47          2.80         2.80      |
| L-7-6               Lne      249.55                        BUS-6/B               446.16          2.48         2.48      |
|                                                            BUS-7/B               443.66          2.50         2.50      |
| L-8-5               Lne      185.75                        BUS-5/B               329.06          1.83         1.83      |
|                                                            BUS-8/B               329.35          1.86         1.86      |
| L-8-7               Lne      111.39                        BUS-7/B               196.17          1.10         1.10      |
|                                                            BUS-8/B               197.51          1.11         1.11      |
| T29-38                Tr2       80.86                        BUS-29/B                830.47          4.55         0.81      |
|                                                            BUS-38/BQ               830.04          4.67         0.81      |
| G9-38               Sym       83.00                        BUS-38/BQ               830.04          4.67         0.81      |
-----------------------------------------------------------------------------------------------------------------------------------
页: [1]
查看完整版本: 求助,使用digsilent构建10机39节点后潮流运算超载如何解决

招聘斑竹