请教如何用BPA算N-1断线?
潮流我已经计算过了,计算的结果放在ieee90.bse中N-1的控制语句如下
(POWERFLOW,CASEID=004BPA,PROJECT=004BPA)
/OUTAGE_SIM\
>OLD_BASE,FILE=ieee90.bse<
>OUTAGE,BASE=110<
>OVERLOAD,BASE=110<
>OUTPUT_SORT,BOTH<
>DEFAULT_RATING<
110. 100.
100. 500.
(END)
计算的结果如下:
-----------------------------------------------------
* 潮流数据文件是 : (c:\documents and settings\administrator\桌面\bpa\ieee9\bpapf1.dat)
[ INTERACTIVE RUN ]
(POWERFLOW,CASEID=004BPA,PROJECT=004BPA)
/OUTAGE_SIM\
PWRFLO case: 004BPA proj: 004BPA * * * OPTION SUMMARY * * * Date: 22-JUL-11
************************************************************************************************************************************
* *
* *
* *
* DATA FILES : (X) INPUT COMMAND FILE:c:\documents and settings\admi *
* ( ) OLD BASE FILE : *
* ---- ---- ------ ( ) BRANCH DATA FILE : SELECTION DATE: *
* BUS DATA FILE : *
* *
* *
* *
* DATA ON 100.0 MVA BASE *
* *
* REPORT SORT ORDER (X) BUS-BASE *
* ------ ---- ----- ( ) ZONE-BUS-BASE *
* ( ) AREA-BUS-BASE *
* *
* *
* *
* LISTINGS REQUESTED PAPER FICHE *
* -------- --------- ----- ----- *
* *
* INPUT LISTING (X) NONE ( ) NONE *
* ----- ------- ( ) ZONES ( ) ZONES *
* ( ) FULL (X) FULL *
* *
* OUTPUT LISTING (X) NONE ( ) NONE *
* ------ ------- ( ) ZONES ( ) ZONES *
* ( ) FULL (X) FULL *
* *
* ANALYSIS LISTING ( ) LEVEL 2( ) LEVEL 0 *
* -------- ------- ( ) ZONES ( ) ZONES *
* ( ) OWNERS ( ) OWNERS *
* *
* AREA INTER. LISTING ( ) NONE *
* ---- ------ ------- ( ) TIE LINE *
* ( ) MATRIX *
* (X) FULL *
* *
* *
* *
* OWNER INTER. LISTING (X) NONE *
* ----- ------ ------- ( ) TIE LINE *
* ( ) MATRIX *
* ( ) FULL *
* *
* *
* *
* NEW BASE NOT SAVED *
* *
* *
* *
************************************************************************************************************************************
PWRFLO case: 004BPA proj: 004BPA C O N T I N G E N C Y A N A L Y S I S Date: 22-JUL-11
Listing of Input Command Records
OUTAGE TEXT (/OUTAGE_SIM\ )
OUTAGE TEXT (>OLD_BASE,FILE=ieee90.bse< )
OUTAGE TEXT (>OUTAGE,BASE=110< )
OUTAGE TEXT (>OVERLOAD,BASE=110< )
OUTAGE TEXT (>OUTPUT_SORT,BOTH< )
OUTAGE TEXT (>DEFAULT_RATING< )
OUTAGE TEXT ( 110. 100. )
OUTAGE TEXT ( 100. 500. )
OUTAGE TEXT ((END) )
Summary of Outage Simulation case IEEE9 Dated 22-JUL-11
************************************************************************************************************************************
* *
* *
* *
* OLD BASE FILE : c:\documents and settings\administrator\ *
* *
* *
* SELECTION OF BRANCH OUTAGES: ZONES = ALL *
* BASE KV RANGE110.0 TO 9999.0 *
* *
* *
* SELECTION OF BRANCH OVERLOADS:ZONES = ALL *
* BASE KV RANGE110.0 TO 9999.0 *
* *
* *
* MINIMUM BRANCH RATINGS: (X) ACTUAL OR DEFAULT RATINGS *
* LEGEND: "N" = NOMINAL, "T" = THERMAL, "L" = LOSS OF LIFE, "B" = BOTTLENECK *
* (X) EXTEND RATINGS IF OVERLOADED TO BASE LOADING PLUS5.0 PERCENT *
* (0.800) PRESCREEN RATING REDUCTION (P.U.) *
* (1.000) MIMINUM THRESHOLD RATINGS (P.U.) *
* *
* *
* REDUCTION SCHEME: ( ) NO REDUCTION *
* ( 2) EXPANSION OF BUFFER ZONE FOR ESSENTIAL NETWORK *
* (X) OPTIMALLY DETERMINED EQUIVALENT NETWORK *
* ( ) RETAIN "REI" EQUIVALENT OF ELIMINATED GENERATORS *
* ( ) PRESERVE R/X RATIO OF ELIMINATED BRANCHES *
* ( 0.200) MIMIMUM ADMITTANCE OF EQUIVALENT BRANCHES (P.U.) *
* *
* *
* SOLUTION PARAMETERS: (X) REAL POWER CONSTRAINED *
* (X) REACTIVE POWER CONSTRAINED *
* (X) LTC PHASE SHIFTERS REPRESENTED AS CONSTANT TERMINAL INJECTION *
* ( ) LTC PHASE SHIFTERS REPRESENTED AS CONSTANT PHASE ANGLE *
* ( 12) MAXIMUM ITERATIONS *
* (0.0200) CONVERGENCE TOLERANCE (P.U.) *
* (6.28) REAL POWER DIVERGENCE TOLERANCE (RADIANS) *
* (0.00) REACTIVE POWER DIVERGENCE TOLERANCE (P.U. VOLTAGE) *
* *
* *
* OUTPUT SUMMARY REPORTS: (X) OUTAGE - OVERLOADS *
* (X) OVERLOAD - OUTAGES *
* (X) REPORTS SORTED BUS - OWNERSHIP *
* ( ) REPORTS SORTED OWNERSHIP - BUS *
* *
* *
************************************************************************************************************************************
*** WARNING NO OVERLOAD CHECK BRANCHES EXIST FOR THE ZONE AND VOLTAGE CLASS INPUT *** WARNING
PWRFLO case: 004BPA proj: 004BPA **** CASE PROCESSING SUMMARY **** Date: 22-JUL-11
THERE WERE 0 TYPE "I" (INFORMATIONAL) ERRORS
1 TYPE "W" (WARNING) ERRORS
0 TYPE "E" ERROR
0 TYPE "F" (FATAL) ERRORS
AND 0 TYPE "A" (ABORT) ERRORS
* * * ERROR MESSAGES ENCOUNTERED * * *
*** WARNING NO OVERLOAD CHECK BRANCHES EXIST FOR THE ZONE AND VOLTAGE CLASS INPUT *** WARNING
*** FATAL Program terminated by error conditions. If "F" errors have been encountered, correct and rerun. *** FATAL
*** FATAL Otherwise report to programming staff. *** FATAL
-----------------------------------------------------
我想问为什么会有FATAL,还有怎么没结果显示啊?难道是我的控制语句写得不对?我在网上找了好久都没有介绍怎么算断线故障的,还请大神给我指点一下。 我说一下我遇到过的情况。没有加“>DEFAULT_RATING<”语句,但是在潮流数据文件dat中,每条线路参数都设置了额定电流值。但是一开始设置的数值都很小,潮流dat文件可以运行,但是N-1的dat文件报错如楼主所说。在修改了各条线路的额定电流参数后,N-1校验dat文件可以正常运行,并显示电压越限节点和过负荷线路情况。 注释掉就可以了吧。::lol::::lol:: 很少有人用BPA算N-1吗? 算N-1,是SWI程序吧? 算N-1,是SWI程序吧?
geytao 发表于 2011-8-30 14:33 https://tech.cepsc.com/images/common/back.gif
你是指用稳定来计算? 回复 4# facat
是吧? 胡扯,BPA的N-1断线校验是属于热稳定问题,和暂态稳定计算没关系,不涉及swi卡。
看看BPA的说明书吧,貌似没什么问题。
很可能是你目标文件路径里有“桌面”这样的中文引起的错误。 直接把线路注释掉就可以了啊 胡扯,BPA的N-1断线校验是属于热稳定问题,和暂态稳定计算没关系,不涉及swi卡。
看看BPA的说明书吧,貌 ...
joeyuan 发表于 2011-9-12 00:32 https://tech.cepsc.com/images/common/back.gif
在不含中文的目录中运行也是一样的错误 6楼正解 我也遇到相同问题,不知道是什么原因
页:
[1]
2